Skip to content
PetroQube
Technical learning & engineering methods

PetroQube Knowledge Center

Practical explanations of petroleum engineering calculations, field-unit conventions and production metrics. Each guide states its equation, unit basis, a worked example and the limits of the simplified method.

These guides are educational technical references. Confirm the applicable standard, reference conditions, input quality and company procedures before using an equation in an operational or design decision.

1. Oilfield volume and gas measurement units

Petroleum operations mix customary field units with SI units. A barrel is a defined unit of liquid volume; it is not a universal name for every volume encountered downhole. Clear labels prevent errors when moving between stock-tank, surface and reservoir conditions.

Liquid volume: bbl, STB, gallons and SI units

One petroleum barrel is exactly 42 US gallons. Using the US liquid gallon definition, this is approximately 158.9873 litres or 0.1589873 cubic metres. An Imperial gallon is larger than a US gallon, so the two must not be interchanged.

1 bbl = 42 US gal = 158.987294928 L = 0.158987294928 m³

STB means stock-tank barrel: the oil volume measured at defined surface stock-tank conditions. The symbol rb is commonly used for reservoir barrels. The same nominal barrel volume unit can be used to express either, but the physical fluid volume differs because pressure, temperature and dissolved gas change the volume.

Reservoir oil volume ≈ stock-tank oil volume × Bo

For example, if Bo = 1.25 rb/STB, 1,000 STB corresponds to about 1,250 rb at the stated reservoir conditions. This is an illustrative formation-volume-factor calculation; Bo must come from representative PVT data.

Gas volume: scf, Mscf and MMscf

Standard cubic feet are gas volumes referred to a stated standard temperature and pressure. The words “standard” and “normal” are not enough by themselves: reference conditions differ by jurisdiction, contract and company. Always record the reference temperature and absolute pressure beside the rate or volume.

1 Mscf = 1,000 scf · 1 MMscf = 1,000,000 scf

Converting a gas volume unit does not correct for a change in standard conditions, gas compressibility or composition. Those require a real-gas correction using the relevant state conditions and properties.

Pressure basis: psig and psia

Gauge pressure is measured relative to local atmospheric pressure; absolute pressure is measured relative to vacuum. The relationship is:

Pabs = Pgauge + Patm

Do not convert psig to psia by applying a simple unit scale. The atmospheric pressure at the measurement location is required. For gas laws and many PVT calculations, absolute pressure is the required basis.

Use the petroleum unit converter →

2. Hydrostatic pressure and equivalent circulating density

Hydrostatic pressure is the pressure exerted by a fluid column. In common oilfield units, the constant-density approximation uses mud weight in pounds per US gallon and true vertical depth in feet.

Phyd (psi) = 0.052 × MW (ppg) × TVD (ft)

Worked hydrostatic example

For a 10.0 ppg fluid column at 8,000 ft TVD:

Phyd = 0.052 × 10.0 × 8,000 = 4,160 psi

The calculation assumes uniform density and a static column. TVD is the vertical height of the fluid column; measured depth is not a substitute in a deviated well. In a real well, fluid density may vary by depth and temperature, and pressure can be affected by applied surface pressure, fluid interfaces and transient conditions.

Equivalent circulating density

ECD expresses the combined hydrostatic and annular circulating pressure effect as an equivalent fluid density. A commonly used field-unit approximation is:

ECD (ppg) = MW + ΔPann / (0.052 × TVD)

For 12.0 ppg mud, 250 psi annular pressure loss and 10,000 ft TVD:

ECD = 12.0 + 250 / (0.052 × 10,000) = 12.4808 ppg

Use the annular pressure-loss value appropriate to the chosen well section and circulation state. Do not confuse annular friction pressure loss with total circulating pressure or standpipe pressure. ECD is especially sensitive to depth, hole geometry, rheology, flow rate, cuttings loading and temperature.

Open the Drilling Engineering hydrostatic pressure and ECD calculators →

3. Volumetric oil initially in place (OOIP / STOIIP)

The volumetric method estimates the initial oil volume contained in a mapped reservoir interval using areal extent, net pay, porosity, initial water saturation and oil formation volume factor. In field units, a common expression for stock-tank oil initially in place is:

N (STB) = 7,758 × A (acres) × h (ft) × φ × (1 − Swi) / Bo

In this expression, φ and Swi are entered as fractions (not percentage points), Bo is in reservoir barrels per stock-tank barrel (rb/STB), and 7,758 converts acre-feet to barrels.

Worked volumetric example

Assume A = 640 acres, net pay h = 30 ft, porosity φ = 0.18, initial water saturation Swi = 0.25 and Bo = 1.25 rb/STB:

N = 7,758 × 640 × 30 × 0.18 × (1 − 0.25) / 1.25
N = 16,086,988.8 STB (approximately 16.09 MMSTB)

This is an in-place volume estimate, not recoverable reserves. Recoverable quantities require a defensible recovery factor or a more complete reservoir evaluation. Uncertainty in contacts, net-to-gross, porosity, saturation, pressure, fluid properties and areal mapping can dominate the result.

Good practice

Open Reservoir Engineering calculators →

4. Production metrics: water cut, WOR and GOR

Production surveillance compares oil, water and gas rates on a consistent time basis. Basic ratios are useful for screening, trend monitoring and identifying changes, but they do not independently diagnose the cause of a production change.

Water cut (%) = qw / (qo + qw) × 100
WOR = qw / qo
GOR = qg / qo

Suppose a well produces 800 STB/day oil, 200 bbl/day water and 1,600,000 scf/day gas:

Ensure the gas and liquid rates refer to the same well, time interval and reporting conditions. GOR must use a declared gas standard condition and a stock-tank oil basis. For commingled streams, allocation and measurement uncertainty may materially affect the ratios.

Interpretation cautions

A rising water cut may be consistent with water breakthrough, coning, changing lift performance, injection effects or measurement/allocation changes. A changing GOR can reflect reservoir depletion, gas-cap contribution, solution-gas liberation, lift-gas allocation or measurement conditions. Trends should be interpreted alongside pressures, choke settings, lift design, well tests, completion details and reservoir context.

Open Production Engineering water cut, WOR and GOR calculators →

How PetroQube tools are developed

Each interactive calculator should display its equation, input units, output units and material assumptions. Reference cases and invalid-input cases are used during local testing. Unit conversion categories state their reference basis and identify cases that cannot be resolved by a simple scale factor, such as gauge-to-absolute pressure and reservoir-to-stock-tank volume.

PetroQube’s browser calculators run locally in the visitor’s browser. They do not currently submit calculator inputs to a PetroQube calculation server. This statement should be revisited if analytics, accounts, cloud saves, API-backed data or other network features are added.

Content revision date: 22 November 2026. Corrections and technical feedback are welcome through the email and messaging options on the Support page.